Oluwole OyenugaResume, Page 1 OLUWOLE OYENUGA PMP,
ITIL, OCS 15335 Park Row, #1902 Phone: 832.892.0402 Houston, TX, 77084Email: woleoyenuga@yahoo.com
OBJECTIVE
Planner/Scheduler &
Project Controls Specialist
Summary of Experience
Over 15 years of working experience both locally
and internationally in the execution of EPC, Oil & Gas (Upstream
& Downstream), Utility, LNG Projects specialized in Planning and
Scheduling, Cost Analysis, Risk Management and Consulting. A certified Project Management Professional and
Primavera Consultant (SME) with strong technical and functional background
and a proven record of success, skilled in transitioning IT infrastructure
and applications, as well as a background in implementation, deployment,
gathering and analytics, service and support Qualifications PMI
Certified Project Management Professional (PMP No: 1253831) AACE
certified in Project Controls Risk
Analyst using Oracle Risk Analysis 8.7 SP3 ITIL
certified Specialist (Foundation) Oracle
Primavera Administrator and user Trainer Oracle
certified Primavera EPPM Implementation Specialist Key Skills Assessment
|
|
§ PMO Program/Portfolio Management § ITIL Service Management § SAP Project Management § Earned Value Analysis § Maximo § Acumen Fuse, Acumen Risk and 360 § Primavera Inspire/SAP § Subsea |
§ IT Project Management (SDLC,
AGILE, WATERFALL) § P6 EPPM R15.1 § MSP Planning/Scheduling § Primavera Training R8.4 § Oracle, SQL, BNR Databases § Bi-cycle § Primavera Risk Analysis 8.7 SP3 § Primavera Analytics |
§ Primavera Unifier § Visualizer (TSLD) § TAR Planning § Construction Planning § Suretrack § Change Management § Maxavera § Primavera Implementation &
Administration |
BRITISH PETROLUEM
ANGOLA
01/2012 – 04/2015
Regional Primavera Consultant sme (Activity Planning)
FPSO onshore and offshore Planning
supporting (GtP Blk 18, PSVM Blk 31 also BLK 15, BLK17)
§
Worked a 6weeks/2weeks 10hr/day 6days/week
rotation. (Houston – Angola)
§
POB Management of two FPSO
Schedules for all Planner/Schedulers (PSVM and GtP) interfacing with Maximo
and Maxavera
§
Involved in the management of Schedule for
the First oil for PSVM FPSO in Angola
§
Ultra Deep-water Scheduling for Subsea
planning and scheduling involving sub functions
§
Lead in the POB maintenance and alignment on
FPSO and Resource leveling effort in the Region
§
Work with the existing offsite planners to
develop an overall coding structure for all offsite projects that enhanced
better and more efficient project reporting/updating system.
§
Developed
leading indicator progress curves, that highlights critical project
activities and recommending mitigation plans to forestall/reduce schedule
slippages.
§
Worked with all
Business units Modifications, Subsea, New Well Delivery, Reliability and
Maintenance, Base Management, HSE, in development of their Schedules
§
Maintain
administration of access rights, global codes, layouts, resources and overall
Primavera functionality
§
Monitored KPI
Indicators for the region-using Bicycle.
§
Overseen the TAR
team in TAR Planning for GtP and PSVM FPSO for the Region
§
Provide leadership and direction in the
consistent use of Primavera within the team.
§
Served as technical expert for
tasks/projects/programs required to maintain successful Primavera
administration and implementation.
§
Developed work training packages for the new
users in the Region
§
Develop and
communicate a Primavera Implementation strategy that enables BP to make the
best use of the Primavera enterprise system
§
Ensure system is
practical, cost effective and is linked to needs of all users to drive
business efficiency
§
Coach and
support the various assets and functions in the migration to Primavera R8.3
from previous version P6.2.1
Reviewed and analyzed contractor schedules for
quality as it adheres to planning standards, critiquing contractor schedules,
offering corrective suggestions and integrating contractor schedule with
client planning activities.
§
Work with Planners/Schedulers to achieve and
sustain alignment of tools, processes, systems, training and coaching with
regards to Primavera use
CNA INSURANCE, Chicago,
IL / Houston, TX
10/2010- 01/2012
PMO Primavera Project Administrator/Planning &
Scheduling
PMO Staffing planning/ Work Flow
/Forecasting/Project Portfolio management
§
Worked with senior management and PMO to
establish the Enterprise Project Structure, Resource Hierarchy and
Organizational Breakdown Structure (OBS) in the Project Management Module.
§
Program and Portfolio management of Project,
Resource Planning, Forecasting using P6 R7.1 Client, Web Access, Timesheet
Administrator
§
Supported all Managers with day-to-day
running of project tasks through the extensive use of Primavera Web
§
Responsible for project
structure development and implementation throughout the IT Organization.
§
Access in process workflow, managing user
views and dashboards.
§
Interacted and supported various levels of
management to resolve project issues, change management, KPI indicators.
§
Ensure reliability, practicality and cost
effectiveness of Primavera and associated systems.
§
Integration with SAP PM using Primavera
Inspire.
§
Analyze data and system performance to
identify and implement possible improvements.
§
Prepares reports including but not limited
to all scheduling updates and analysis, progress reporting, change management
and various reporting for upper management. Additionally, provide
analysis and reporting and /or specific planning and scheduling issues.
United illumination – (Contract) Houston, TX / CT
04/2010 – 07/2010
Project Controls Analyst
“Smart Grid Project”
The UI's Smart Project aimed to
provide reliable, affordable, efficient and effective utility services
§
Built schedule using Microsoft project from
client schedule, incorporating into Primavera 6.2 from initiate to closeout.
§
Organized risk brainstorming sessions to
identify, assess and mitigate risk in the schedule.
§
Developed and monitored risk level through
risk management plan.
§
Participated in Selection Kickoff and
assisted in developing the project objectives and templates.
§
Organized and coordinates risk assessment
brainstorming for the entire project and interfaced with various risk owners
and Project Manager in providing mitigation actions for the identified
risks. Facilitates weekly progress meetings, while also presenting
project progress to all stakeholders. Issue Level 1 management summary
schedule, and Level 2 & 3 schedules for project teams. Developed, tracked
and issue milestone log and payment on a monthly basis.
§
Production of ``what if`` scenarios and
plans to suit both client and contractor requirements.
§
Mentoring and development of planning
personnel, to raise their competence, awareness, knowledge and techniques required
in the execution of planning functions
§
Performed in-depth schedule risk analysis,
and ran Monte Carlo simulations for risk assessment to determine impact on
margins.
ARIOSH ENGINEERING, Houston/Nigeria
02/2009 – 09/2010
Lead Planner/Scheduler/ Risk Analyst (LNG Project)
Gas wellhead platforms and
pipelines portion of Chevron's Olokola Gas Supply Project
The offshore terminal will collect
gas from offshore fields and transport up to 2.3 Bcf/d of natural gas to the
Olokola LNG plant
§
Prepared and maintained Front End
Engineering Design (FEED) Schedule as well as Level 3 fully logic-driven
resource-loaded schedules.
§
Conducted and produced weekly schedule
meetings, narratives and analysis as a scheduler as required by clients.
§
Created and maintained Earned Value spread
sheets for each work site and client.
§
Implemented planning schedule actions
arising from the impact of risks identified during risk assessments for
deliverables, and project milestones using Primavera.
§
Direct and supervises subordinates in the
performance of planning/scheduling activities
§
Developed the Engineering, Procurement and
Installation schedule, including transportation and installation activities.
§
Interfaced with stakeholders and issued
monthly reports.
§
Revised the baseline schedule in line with
the approved change orders. Ensure deliverables dates are met in within
contractual dates.
§
By building a good and workable schedule was
able to reduce field changes, construction clashes by 98%, downtime by 20%
and reduced construction time by 5%.
JACOBS ENGINEERING, Houston, TX
02/2008 – 02/2009
Construction Planner/Scheduler
BP Coal Bed Methane Project Denver/
Pipeline integrity Project (PIP) Texas-City
§
Collaborated with other project management
team members involved in development of the work breakdown structure (WBS,)
to support the project deliverables.
§
Coordinated and prepared monthly schedule
reporting and cost, including schedule forecast updates and contingency
management.
§
Work directly with Project team members in
building an overall resource loaded schedule.
§
Preparation of various reports including
earned value analysis, full schedule report and S-curve report
§
Monitored schedule deviation for assigned
disciplines and recommended corrective actions.
§
Provided schedule analysis and studied
problem areas to determine criticality of activities; recommended alternative
solutions.
§
Attained 99%+ customer satisfaction in
providing a baseline to move project forward.
§
Was involved in Pert Master Schedule Risk
Analysis as required on Project of Total Installed Costs (TIC) of $2.4B.
§
Constructed and maintained EPC Primavera
Integrated Master Schedules with TIC values in the range of $50M - $500M in
support of project and client requirements.
§
Saved $4+ million (65 %+) in project costs
through a realistic Schedule Interactive planning strategy (IPS).
El Paso Corporation, HOUSTON, TX
Contract
04/2006 – 02/2008
Planner/Scheduler
The Phase III expansion – Elba Expansion Project
This will add 8.4 billion cubic feet (Bcf) of LNG
storage, which will more than double Elba's storage capacity to 15.7 Bcf.
The expansion will also add .9Bcf per day (Bcf/d) of send-out capacity,
raising Elba's capacity to 2.1
Bcf/d.
§ Developed, maintained and controlled a resource-loaded
schedule for various capital projects and maintenance projects using
Primavera P3 software.
§ Liaised with various departments including engineering and
procurement in coordinating work sequences within the integrated project
plans.
§ Performed sub-sea scheduling on offshore installations
such as FPSO, FSO conventional and horizontal Christmas trees, coordinated
and followed-up with contractors on offshore/onshore projects to ensure
timely completions, achievements of project objectives and adherence to
budget.
§ Monitored progress against baseline during the project
life-cycle.
§ Evaluate and analyze Monte Carlo analysis for each project
with specific emphasize on project margin. Occasionally travelled offshore to
monitor progress
§ Preparation of 2week, 4week & 60day look-ahead
schedules.
B BRAUN, Houston,
TX
2005 - 2006
INFRASTRUCTURE LEAD.
§ Created a 3-5 year plan for the organization as well as a
staff-training manual, utilizing ITIL, methods, processes, strategic
technology infrastructure planning, and developing cost effective solutions.
§ Provided internal consulting and mentoring ITIL Service
Support areas of incident, problem, change, release, configuration management
and service desk as well as project management guidance to managers and
business units.
§ Developed and implemented a consistent, standardized
process that improved IT infrastructure and enabled business process
efficiency.
WAL-MART, Detroit,
MI 2004 - 2005
Software Development Project – Project Coordinator
§ Led end-to-end project lifecycles from customer
prospecting to contract negotiations and implementations.
§ Built alliances with independent partners and managed
complex proposal developments; Instituted Share Point as the collaborative
medium for cross-company project management.
§ Improved customer satisfaction and on-time delivery from
80% to 96%;; managed virtual teams consisting of Programmers, Testers and
contracting staff on multiple projects, coming in 10% below budget.
PFIZER PHARMACEUTICAL, Surrey, UK
2000 -
2004
Site Planner/Scheduler
§ Planned and supervised the effort to establish milestones
for total project and major portions of the project.
§ Reviewed and updated project work activities to ensure
support of milestones.
§ Performed productivity analysis of construction operations
and crew analysis of work operations by craft.
§ Performed schedule monitoring, including identifying
critical activities and updating functions for specific applications,
disciplines or specialties.
§ Assisted in the development of requirements for updating
and monitoring the schedules.
ELF PETROLEUM, London,
UK 1998 - 2000
Project Planner/Project Analyst
§ Assisted in reviewing proposal provisions related to
schedule/cost engineering and material control, developed supporting data for
contract negotiations.
§
Maintained change management systems,
identifying variances from original scope of work.
§
Responsible for establishing scheduling
format, maintenance, analysis and reporting presentation.
Bachelor of Science, Obafemi Awolowo
University, Ile-Ife, Osun State Nigeria
Computer Information Systems, Washtenaw
Community College, Ann-Arbor, MI
PMP Certified: No. 1253831, PMI
Certified ITILv3 Foundation
Oracle Primavera EPPM Certified Implementation Specialist (OCS)
Milestone Training Institute, Hands-on training
and configuration in SAP FICO/MM/PP
Primavera 6.0 Courses 601, 602, Primavera
Systems, Philadelphia, PA
Pert Master Risk Conference, Pert Master,
Houston, TX
19SA5 Safety Awareness 5, OSHA General Safety
& Site Specific, Texas-City, TX
Project Cost Control and Estimating Training, AACEI Houston Chapter, Houston, TX
National Scholars Honor Society
PMI Institute
AACE International
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|